Decks 85 Brennan
This
Ipe deck has been left to weather naturally. It will take 2 full years
to become silver toned in color.
This
one was installed with hidden fasteners. I waited to take the pics until
the grass was in and the color has changed
quite
a bit in four months.
We
had a couple of intersting twists on this one. We had to re-route the downpipe
for the gutters to the outer edge of the deck
and
also hide two fittings that were higher than the deck. We made a plant
stand platform to hide the fittings and used
a
ten foot section of drainpipe to extend the gutter downspout.