Decks 81 Martin

This deck had a good frame underneath, so with a few extra framing boards we got it decked for a reduced cost.
We also stained the deck and the fence we built at the same house. The fence had metal posts so those we re-used
as well so the total cost of the project was approximately 70% of the original replacement cost.